Get 20% off this month when you try our services! Order Now to avail special discount

+4474648-84564 info@myassignmenthelp.xyz

SRQ774 | Construction Measurement Assignment 1 | Engineering

SRQ774 | Construction Measurement Assignment 1 | Engineerin

SRQ774 | Construction Measurement Assignment 1 | Engineering

    

PURPOSE OF ASSIGNMENT

The purpose of this assignment is to:

• ULO1: Articulate a thorough understanding of the basic principles and practices of measurement and estimating.

•  ULO2: Demonstrate the use of the Australian Standard Method of  Measurement (ASMM) as a tool for completing measurement and estimating  work.

• ULO3: Measure quantities and estimate unit rates to prepare tenders for common types of low and medium-rise construction.

This  task requires you to take-off quantities for groundwork (up to the DPC  level) of the proposed house from the attached drawings numbered  SRQ774/AT1/01 and SRQ774/AT1/02 and specification notes, in accordance  with the Australian Standard Method of Measurement (ASMM) 6th edition  or. Australian & New Zealand Standard Method of Measurement (ANZSMM)  2018 edition. As part of your take-off, you are required to:

• Set down descriptions with their related dimensions on take-off paper;

• Carry out squaring/extending of dimensions;

•  Ensure you employ all standard techniques and follow all conventions  for setting out construction measurement information in preparing the  take-off;

• Ensure you show all  waste calculations, annotate the take-off with side notes and mark-up  the drawing to show that you have measured all items required;

•  Make sensible assumptions in relation to the measurements where any  information is missing, specification is inadequate or exact nature of  construction is not clear. Any assumptions made shall be entered on to a  Query sheet;

Marks will be awarded  for accuracy of dimensions, descriptions, neatness, logical approach and  extent of assumptions and queries.

Specification Notes

- Topsoil: To be excavated average 150mm deep from the existing ground level.

- Topsoil and Trench excavation: Surplus excavated material to be removed from the site, 10km away from the excavation.

- Trench Backfilling: Backfilling with imported materials.

- DPC & DPM: Lap size is 150mm.

Order Now

Order this assignment now with our #1 Assignment help services

Email: info@myassignmenthelp.xyz

Call: +4474648-84564

Contact Us